Toilet renovation: at Which to start

The bathroom is an area with special conditions: high humidity, humidity differences. That’s why making repairs in the bathroom, you need to clearly plan the entire operating process, to think about the sequence of measures to be achieved. In the following guide, you will find out where to begin the fix in the restroom and what kinds of work ought to be performed together with your hands. Step-by-step directions for bathroom repair

Stage 1: Establishing a strategy and selecting a layout solution.

Fix in the bathroom can be of two types:

  • Unplanned, spontaneous, arising from the can of unforeseen circumstances. By way of instance, in the event of a pipe burst, flooding by neighbors.
  • Planned, which is either capital or cosmetic. It requires planning, serious monetary investment and time.

Begin repairs in the bathroom is to determine the plan, interior. Think through the last detail, what will be the room, choose a color. Pastel colours are conventional, in addition to a blend of blue and blue, or peach with beige.

Begin repairs in the bathroom is to determine the plan, interior layout. Consider detail, what will be the space, choose a colour. Pastel colors are deemed traditional, as well as a mix of colors.

Next point is that the selection of facing substance. Usually, finishing at the toilet is performed with vinyl, porcelain tiles, mosaicand vinyl panels. Check the pipes, if it ought to be replaced. If needed, choose an appropriate option. Proceed to the measuring function: quantify all sides, calculate the area of the room. Based on these data, we mark the location of these plumbing fittings.

Step 2: the selection of sanitary fittings and material for completing.

It’s very important to understand that the purchase price of sanitary ware precedes the planning stage, rather than vice versa. This means that first we develop a design project, make a plan, then go to the store. Yet another thing – you should specify how big your favorite plumbing fittings and inspect the program, whether it matches.

It’s very important to see that the purchase of plumbing fixtures is completed by a planning period, rather than vice versa. This means that first we develop a new design project, make a plan, then go to the store. Another one

In terms of stuff for completing, it is better to buy them immediately for the whole repair cycle, and that you won’t be distracted if something has been missing. Do not forget about preparing the necessary tools.

Measure 3: dismantling tiling and plumbing.

After all the preliminary work is completed, move on to the beginning of the task process:

  • vsyakuhnya.ru Remove the sink and tub from the room, even if they won’t be replaced with new ones. This manner, you may keep them clean and undamaged.
  • Remove the tile, cleaning after it all of surfaces: walls, ceiling, floor.
  • Remove old paint from the walls, even if they had been previously painted, as the adhesive alternative or a new layer of paint will not stick to the surface.

Step 4: Cost of communications: pipes, electric wiring.

Very often in an old home, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but also the principal riser, and sometimes the interfloor pipes. What’s it worth doing so? Old pipes anytime can give a flow, then the new fix will be emptied, it will require extra investment to eliminate defects.